Filling Line Pre-Engineering Study for a $25B Company in the Aerospace Industry
Case Study

Background
Our client wanted to improve two key areas of their manufacturing: productivity and coatings filling accuracy—initially planning to achieve it by upgrading their existing equipment with new, automated equipment.
Partnering with them to ensure they were addressing the root cause and suspecting there might be a more effective path, we rolled up our sleeves and joined their teams on the factory floor. We discovered how they could tap into improvement opportunities without heavy investment and get it right the first time.